I am now accessing as a :

Government Of Assam Power Inspectorate of Electricity (IEC)

Sub Station and Electric Transmission Line

  • APPLICATION SEEKING APPROVAL TO COMMENCE POWER SUPPLY IN SUB-STATION AND LINE EXCEEDING 650 VOLTS REQUIRED FOR THE PURPOSES OF ACCORDING APPROVAL UNDER REGULATION 43 OF THE CENTRAL ELECTRICITY AUTHORITY (MEASURES RELATING TO SAFETY & ELECTRIC SUPPLY) REGULATIONS, 2010.

    NOTE :

    1. No Electrical installations or apparatus of voltage exceeding 650 volts shall be energized without written approval from the Inspectorate of Electricity.
    2. Annexure IIB need not be submitted where only one apparatus of voltage exceeding 650 volts equipment, such as transformer is installed.
    3. The Electrical Inspector may require certain additional tests to be carried out before authorizing the supplier to commence supply.
    4. This report shall be submitted in duplicate.

    Apply Online for APPROVAL TO COMMENCE POWER SUPPLY