Government Of Assam Power Inspectorate of Electricity (IEC)

Apply for Approval for Sub-Station & Line

FORM OF APPLICATION SEEKING APPROVAL TO COMMENCE POWER SUPPLY IN SUB-STATION AND LINE EXCEEDING 650 VOLTS REQUIRED FOR THE PURPOSES OF ACCORDING APPROVAL UNDER REGULATION 43 OF THE CENTRAL ELECTRICITY AUTHORITY (MEASURES RELATING TO SAFETY & ELECTRIC SUPPLY) REGULATIONS, 2010.

NOTE :

  1. No Electrical installations or apparatus of voltage exceeding 650 volts shall be energized without written approval from the Inspectorate of Electricity.
  2. Annexure IIB need not be submitted where only one apparatus of voltage exceeding 650 volts equipment, such as transformer is installed.
  3. The Electrical Inspector may require certain additional tests to be carried out before authorizing the supplier to commence supply.
  4. This report shall be submitted in duplicate.
Downloads
TitleSizeDetail
PDF icon Application form for statutory approval for energizing HV_EHV Overhead Lines exceedig 650 Volts..pdf25.49 KBswf-image
PDF icon Application form for statutory approval for energizing HV_EHV Sub-Stations exceeding 650 Volts..pdf28.48 KBswf-image
How do i